Guidelines for Installation  
Sub Floor Preparation Depending on type and condition of sub floor, a mechanical treatment (e.g. mechanical brushing, grinding with sand paper size 16, milling or ball blasting) is required. Intensity of such work needs to be determined at site. Dust, paint, residual adhesives or other surface pollution must be removed by suitable means. We recommend to clean the surface with an industrial vacuum cleaner. If not constructionally required, cracks and gaps must be filled with concrete crack filler CCF-30 and floor brackets. To improve the adhesion of dispersion based adhesives the sub floor should be primed with a suitable primer. If required, evenness and absorption ability of the sub floor must be generated by leveling with STAUF leveling compound FLC-500. A primer is generally required on floors with sub floor heating systems. Please refer to our technical information on sub floor preparation. Bond it